Hong Kong Central Subway, Lantau Airport Railway
This contract involved the construction of 265m of pedestrian cut-and-cover tunnels in central Hong Kong . Part of the tunnel was constructed by cut and cover methods under Pedder Street and Connaught Road Central. Twin tunnels were also excavated under Exchange Square . A major breakthrough was also required into Central Station. Services included the design and design liaison support for the 265m long cut-and-cover tunnel. Atkins undertook the detailed geotechnical appraisal, computer modelling and detailed structural design of the proposed subway, and the instrumentation monitoring of the existing buildings and utilities design. |