| DB320 Kwai Tsing Tunnels
Atkins was the lead designers for this design and build contract for the West Rail project. The works involved the design of bored tunnels, cut and cover tunnels and ventilation buildings. It involved the innovative use of the first EPBM (Earth Pressure Balance Machine) in Hong Kong for construction of railway tunnels. Tunnelling by TBM under sensitive buildings was required and the project also included drill and blast tunnels through the urban area. |