Shatin to Central Link - SDC300 Kai Tak to Hung Hom Section
Lead consultant in JV to develop the feasibility study up to Scheme Design for this 4km underground section of the SCL. It includes four stations, three to be constructed by cut and cover methods and one in cavern at Ho Man Tin . Two of the stations will be constructed under major roads close to sensitive buildings and involve major traffic and utility diversions. The 4km of 6.8m diameter bored tunnel will be constructed by TBM through soft ground and rock. |