|
Hong Kong Hung Hom Mass Transportation Centre ¡V Station Planning and Passenger Modelling
The Hung Hom Mass Transportation Centre is one of the key interchange stations on the planned Shatin to Central Link (SCL). It was initially planned to facilitate interchange between two future lines and one existing line. The station would accommodate more than 130,000 passengers during peak hour and over one million passengers per day. Atkins used the LEGION pedestrian simulation model to assess the viability and safety of the proposed station design. The initial LEGION model results demonstrated that the design scheme failed to accommodate the forecast patronage numbers at desirable service levels. Subsequently, having undertaken a re-design process, the LEGION model was used to demonstrate that the desired service levels and operational requirements could be achieved with the revised design scheme. Thus it was demonstrated that the station capacity could be increased by 35% without increasing the station footprint. The LEGION model proved valuable in optimising the design in a systematic and robust manner and with the ability to critically assess costs and benefits of layout changes. In addition, an evacuation simulation model was developed that helped to demonstrate for various evacuation scenarios that each of the station areas could be cleared within specified times. |